Dholera SIR Projects
Dholera SIR Projects

Dholera SIR Projects

Core Administration & Commercial Hubs

Design & Construction of ABCD Building
The Contractor scope includes Design, Procurement, Construction, Installation, Testing, and Commissioning of the Administrative and Business Centre for Dholera (ABCD) Building, including smart glass structures, centralized server installations, and civic management workspaces.
Contractor : M/s Cube Construction & Engineering Ltd
Contract Value (INR Crores) : 72.31
Status :Completed

Interior Works of BEC Building
The Contractor scope includes comprehensive interior works and architectural finishes for the Business and Exhibition Centre within the ABCD Complex.
Contractor: New Concept
Contract Value (INR Crores): 19.44
Status: Completed

Experience Zone at ABCD Building
The Contractor scope includes creating an Experience Zone featuring a physical miniature model, projection mapping, and digital walls.
Contractor: Tagbin
Contract Value (INR Crores): 4.84
Status: Completed

Transport, Roads & Connectivity

Design & Construction of Roads & Services
The Contractor scope includes design and construction of the project roads and utilities/services like road network, water supply, sewage and drainage networks, ducts, bridges, and plot-level roads in Dholera.
Contractor : M/s Larsen & Toubro Ltd
Contract Value (INR Crores) : 1801.07
Status :Ongoing

EPC of Sarkhej-Dholera Semi High-Speed Rail Corridor
The Contractor scope includes turnkey engineering, procurement, and construction of a 134 km double-line broad gauge network. This covers the main rail alignment connecting Sarkhej to Dholera SIR, along with direct spur lines extending to the Dholera International Airport and the National Maritime Heritage Complex (NMHC) at Lothal. The mandate involves civil works (railway formations, structural viaducts, major/minor bridges, and station buildings), track-laying systems (both ballasted and ballastless formats), overhead traction/electrification, advanced signalling, telecommunications networks, and an operational control centre.
Contractor: Bidding open (Administered by Western Railway Engineering Office)
Contract Value (INR Crores): 18,901.68
Status: Under Bidding Stage (Bids close December 2026)

Runway, Taxiway, and Apron Packages (Dholera International Airport Phase 1)
The Contractor scope includes complete design, engineering, procurement, and civil construction of a 3,200-meter Code 4E-compliant primary runway capable of handling wide-body commercial aircraft. The mandate encompasses grading, sub-grade preparation, asphalt and concrete paving, construction of parallel taxiways, primary exit links, terminal aprons featuring 12 aircraft parking stands, peripheral fencing, boundary walling, airside service roads, and stormwater drainage networks.
Contractor: M/s Varaha Infrastructure
Contract Value (INR Crores): 636.45
Status: Completed (Phase 1 civil works & calibration flight testing finalized; awaiting DGCA commercial licensing)

Passenger Terminal Building & Air Traffic Control (ATC) Tower Complex
The Contractor scope includes design, engineering, procurement, construction, installation, testing, and commissioning of a modern 20,000 sq. meter Passenger Terminal Building engineered to manage an annual capacity of 1.5 million passengers. The contract spans structural works, glass facade installation, advanced interior fit-outs, baggage handling systems, passenger boarding bridges, HVAC systems, comprehensive MEP engineering, flight information displays, and the erection of an independent Air Traffic Control (ATC) tower outfitted with state-of-the-art navigation and surveillance infrastructure.
Contractor: M/s Yashnand Engineers & Contractors
Contract Value (INR Crores): 333.00
Status: Under Construction / Advanced Stage (Targeted opening by late 2026)

Utilities & Wastewater Networks

Raw Water Transmission Main (RWTM – 10 MLD)
The Contractor scope includes the engineering, procurement, and construction of a 10 Million Liters per Day raw water network featuring a pumping facility at Pipli Pumping Station and pipeline routing to Town Planning Scheme 1 (TP1).
Contractor : M/s D. R. Agarwal Infra Pvt Ltd
Contract Value (INR Crores) : 29.67,
Status :Completed (Entered 5-year O&M cycle after successful trial run)

Balance Works of Water Treatment Plant (WTP – 50 MLD)
The Contractor scope focuses on completing the clear water reservoir, supply pipelines, testing nodes, and downstream water distribution architectures.
Contractor: M/s Larsen & Toubro Ltd
Contract Value (INR Crores): 87.97
Status: Ongoing

Sewage Treatment Plant (STP – 10 MLD) & Utility Networks
The Contractor scope encompasses intermediate and terminal pumping stations, a master balancing reservoir, and a 70 MLD primary pumping station with fully integrated automation and long-term O&M.
Contractor: M/s Larsen & Toubro Ltd
Contract Value (INR Crores): 53.13
Status: Ongoing

Common Effluent Treatment Plant (CETP – 20 MLD)
The Contractor scope includes the installation and operation of an advanced industrial effluent treatment plant to handle liquid waste safely, built with a structurally scalable architecture up to 60 MLD.
Contractor: M/s Larsen & Toubro Ltd
Contract Value (INR Crores): 164.50
Status: Completed & Operational

Development of 50 MLD Sea Water Reverse Osmosis (SWRO) Desalination Plant
The Contractor scope includes turnkey development under the Hybrid Annuity Model (HAM) for a 50 MLD Desalination Plant. The structural mandate features marine intake systems, offshore piping networks, onshore raw water pumping facilities, a high-tech pre-treatment filtration block, a primary Reverse Osmosis (RO) membrane building, post-treatment chemical dosing units, a clean water master balancing reservoir, brine outfall systems, automated SCADA integrations, electrical substations, and a multi-year operation and maintenance cycle.
Contractor: Under Final Bidding Evaluation (Administered by DICDL)
Contract Value (INR Crores): 1,049.00 (Estimated Tender Budget)
Status: Tendering Phase (Bids/Qualifications submission finalized; contract award pending technical evaluation)

Smart City Technology & Power Grids

Information & Communication Technology (ICT) Master System Integrator (MSI) Project – Cluster A1
The Contractor scope includes turnkey design, engineering, supply, testing, integration, and commissioning of the city-wide digital nervous system across the Activation Area. The architectural mandate encompasses laying thousands of kilometers of underground high-speed fiber-optic networks through specialized RCC subterranean utility ducts. The digital scope features city-wide high-definition CCTV security surveillance arrays, an automated SCADA system linked to smart water/gas/power meters, a centralized high-tier Data Center, localized public e-governance kiosks, dynamic traffic management networks, and the integration of all IoT nodes into the main master console at the ABCD Building's Integrated Command and Control Center (ICCC).
Contractor : M/s D. R. Agarwal Infra Pvt Ltd (Design consultancy by Wipro)
Contract Value (INR Crores) : 68.99
Status :Completed (Trunk infrastructure integrated; shifting to phase-wise subscriber-end connectivity and standard 5-year O&M)

400/220 kV Dholera-II Gas Insulated Substation (GIS) & Smart Grid Network
The Contractor scope includes complete design, engineering, procurement, electrical layout, civil works, and commissioning of a high-capacity 400 kV / 220 kV Gas Insulated Substation (GIS) alongside its associated outdoor switchyard bays, high-rating power transformers, shunt reactors, and computerized automated protection systems. It integrates a advanced ±125 MVAR STATCOM voltage stabilizer unit to protect the grid from rapid fluctuations caused by neighboring renewable solar park inputs, alongside an underground sub-sector distribution network linked to a 24/7 unmanned SCADA command console.
Contractor: Tendering Stage / Under Technical Evaluation (Administered directly by GETCO)
Contract Value (INR Crores): Part of the overall multi-tier smart power network (Bids submitted under strict turnkey estimation)
Status: Under Bidding Evaluation / Advanced Phase

Healthcare, Safety & Flood Management

Design & Construction of Integrated Healthcare Facility
The Contractor scope includes structural construction and facility engineering for the multi-specialty healthcare facility in Dholera to serve incoming industrial workforces and residents.
Contractor : Joint Venture of M/s SCC Infrastructure & M/s P.R. Patel & Co.
Contract Value (INR Crores) : 133.68
Status :In Progress

Service Area Buildings
The Contractor scope involves the construction and setup of dedicated utility management buildings across TP1 and TP2 to house administrative oversight for ICT fiber connections, smart electricity monitoring systems, and local area maintenance offices.
Contractor: M/s Cube Construction & Engineering Ltd
Contract Value (INR Crores): 34.12
Status: Ongoing

Canal Front Development Zone
The Contractor scope includes construction of the canal front with land filling, civil, MEP, and infrastructure deployment.
Contractor: M/s P.R. Patel & Company
Contract Value (INR Crores): 41.42
Status: In Progress / Ongoing

Adhiya River Bunding & Stormwater Flood Control (Phase 1)
The Contractor scope includes structural river training, heavy civil bunding, and concrete embankments along the Adhiya River corridor to act as a permanent flood barrier protecting the industrial Activation Area from heavy monsoon surges.
Contractor: Joint Venture of M/s SCC Infrastructure & M/s P.R. Patel & Co.
Contract Value (INR Crores): 61.22
Status: Completed

Macro-Connectivity & High-Speed Transit Corridors

Ahmedabad–Dholera Greenfield Expressway (NE-8)
The Contractor scope includes the engineering, procurement, and construction of a 109.019 km long, 4-lane access-controlled high-speed greenfield corridor (expandable up to 8–12 lanes via an already acquired 35-meter right-of-way) linking Sardar Patel Ring Road at Sarkhej (Ahmedabad) to Adhelai Village near Bhavnagar via the main DSIR boundary. Structural mandates feature 6 major interchanges, 3 urban bypasses, smart FASTag tolling systems, dynamic overhead electronic messaging arrays, and a 120 km/h design speed matrix.
Contractor : Jointly executed across 4 packages by Sadbhav Engineering, GHV India, and DRA Infracon.
Contract Value (INR Crores) : 5,800.00 (Total Capital Cost).
Status :Operational (The main corridor opened to vehicular traffic in early March 2026, dropping transit times between Ahmedabad and Dholera to just 45 minutes).

SP Ring Road Expressway Interchange
The Contractor scope includes the design and construction of a high-load multivariable cloverleaf interchange at the junction where the new NE-8 Expressway intersects the southern edge of Ahmedabad’s Sardar Patel Ring Road. The contract covers structural flyover ramps, heavy grading, high-mast lighting, safety crash barriers, and signal-free traffic integration loops.
Contractor: Under Bidding Stage (Administered via National Highways Authority of India - NHAI).
Contract Value (INR Crores): 124.40 (Excluding GST).
Status: Tendering Phase (Bids invited on September 8, 2026; technical bid opening scheduled for October 23, 2026, with an 18-month execution window).

Mega Energy, Solar Power & Industrial Grid Packages

Dholera Ultra Mega Solar Power Park (Phase 1 Grid Additions)
The Contractor scope includes the phase-wise generation rollout of a massive 5,000 MW (5 GW) green energy grid spreading across 11,000 hectares of land. The civil and electrical engineering mandate involves installing rows of advanced monocrystalline/polycrystalline photovoltaic cell structures on automatic single-axis trackers, laying dedicated pooling networks, building sub-station linkages, and formulating long-term power purchase agreements (PPAs) to deliver electricity under competitive tariffs.
Primary Developer : Gujarat Urja Vikas Nigam Ltd (GUVNL) with production blocks won and operated by Tata Power and tenders floated by companies like SJVN.
Project Investment (INR Crores : Over 25,000.00 estimated total park layout.
Status :Operational / Phase-wise Expansion (A foundational 300 MW block is fully commissioned and actively pushing clean energy into the industrial grid; additional 100 MW blocks are currently under active allocation and deployment timelines).

Torrent Power Industrial Smart Grid Distribution
The Contractor scope covers the installation, operation, and maintenance of the downstream retail power distribution grid spanning the Activation Area and initial town planning sectors to guarantee zero-downtime electrical availability for hyper-sensitive factories—including the upcoming multi-billion dollar Tata Electronics Semiconductor Fab.
Contractor: Torrent Power Limited.
Contract Value (INR Crores): 1,200.00 (Long-term grid license project).
Status: Operational & Scalable (Actively handling active industrial loads with automated underground ring-main systems).

Land Reclamation & Early-Stage Logistics

Earth Filling in Selected Plots of Activation Area
The Contractor scope includes bulk site clearing, grubbing, removing unsuitable soil profiles, and performing massive deep soil and earth filling across Plot-A (70 Hectares) and Plot-B (92 Hectares) to an average depth of 2.0 meters to raise plot levels above regional drainage lines and provide stable foundations for upcoming heavy manufacturing facilities.
Contractor: M/s Montecarlo Ltd.
Contract Value (INR Crores): 86.01.
Status: Ongoing.

Service Area Buildings (With Porta Cabins)
The Contractor scope includes the engineering, procurement, and construction of 17 independent Service Area Units outfitted with high-durability Porta Cabins, alongside long-term operation and maintenance parameters to serve as micro-hubs for utility routing monitoring.
Contractor: M/s Bridge & Roof Co. India Ltd (Re-allocated for completion balance).
Contract Value (INR Crores): 32.82
Status: Ongoing.